Water system Improvements:
- Extended City 12” Water Main from St. Francis St. to Freize Ave
- Added two fire hydrants, three main valves, and two lead valves
- Provided access for the City to connect a new water main section on Freeze Ave.
- Installed a new water meter and fire suppression riser for the Assisi Center
Stormwater system improvements:
- Increased capacity of the detention pond in front of the church
- Captured significant Storm Water from the construction area.
- Added the detention basin in front of the school
- Replaced and enlarged the Storm Water Structure in E. Stadium Blvd.
- Replaced the parking lot catch drain in the NE parking lot
Site Excavation (under close supervision of the Pre-K students):
- Placement of the Soil Retentions System
- Excavation of the Assisi Center building pad and foundations
- Excavation and removal of the S.W. Church entrance retaining wall
- Placement of a new terrace and an open area at the S.W. Church entrance
- Excavation of two dumpsters enclosures
Building Construction
- Placement of foundation footings and walls
- Placement of Structural Steel and roof trusses
- Framing of exterior and interior walls
- Concrete floors poured and finished
- Utility rough-ins (Pluming, Electrical, Mechanical)
- Roofing completed
- HVAC Units placed on the roof and connected
- Interior passage established from the Church to the Assisi Center
Landscaping
- Trees and Shrubs planted around the school and church property
- Planting beds established around the detention basins
- Lawn and specialty grasses planted around the detention basins
- Retention walls were placed forming the planting beds for the terrace area