| On September 6,
we spent the day “preparing” for our rough inspection to be scheduled before
next Friday. The remainder of blocking for kitchen cabinets was installed,
the wall between the living room and kitchen was strengthened, the remaining
step leading to the basement was built and the basement was cleaned.
Material for the side porch was not delivered so we could not work on the
porch as planned.
A great sandwich, fruit, beverages and desert lunch was delivered by Agnes Jensen. Thanks a lot! Next Saturday, providing we pass the inspection, we will install insulation and visqeen. Thanks to the volunteers,
**********
|