| On August 23,
with a small but dedicated crew, a lot of work was accomplished.
First all the debri and unused lumber was moved offsite so grading could
take place. The water in the basement was pumped out, hopefully it
won't return now that rain water should be diverted by the new grading.
South side soffit vents were installed. The last, front porch deck
board was installed and the front facade was trimed for vinyl siding.
Lunch was donated by John Schommer and delivered by Laura Stimpson. Thank you both. After lunch vinyl siding was started on the north side and is almost finished. Thanks again to the volunteers,
**********
|
![]() |