| During the week of August
10, 2003, Pat Walters & Sons Heating and Cooling cut locations
for the future duct work.
On Saturday, August 16, a lot of work was done by a fine group of volunteers. The side door was flashed with aluminum and the porch rim joist was bolted below the door; front porch post, frame and decking is complete (minus one deck board, railing and stairs); window wells were installed around the two small basement windows and the rear wall vinyl siding was completed with most vinyl soffit panels installed all around the house. Lunch was donated by Melanie Caughey, Shirly D’Silva and Andrea White. Thank you all. Next Saturday, vinyl siding installation and side porch construction will continue. Thanks for everyone's help,Steve Polgar
**********
|
![]() |