See Photos taken on September 7, 2002; August 31; August 24; August 17; August 3; On July 27; On July 20; On July 13; On June 29; On June 15; On June 8; On June 3; On May 18; On March 30, 2002.
| News: Steve
Polgar, wrote:
On Friday, September 13, two volunteers installed some of the baseboard and door casing molding. On Saturday the 14th, caulking and painting continued indoors, shelves were installed in the closets, the last basement window well was installed, dirt was shoveled under the front porch, the mailbox was moved to it's permanent location, the front porch stairs and railing was installed and ten of thirteen kitchen cabinets were installed. Laura Stimpson and Robert Klinger brought food and beverages for lunch. Everything tasted great, thanks. On Monday the 16th, Greg from Mr. Handyman will continue installing the wood trim and interior doors. Next Saturday, the remaining kitchen cabinets and the bathroom cabinet will be installed, painting will continue inside and out, and the side porch will get stairs and rails. Thanks to all the volunteers. Thanks,
|
See Photos taken on September 7, 2002; August 31; August 24; August 17; August 3; On July 27; On July 20; On July 13; On June 29; On June 15; On June 8; On June 3; On May 18; On March 30, 2002. |
Habitat for Humanity, Catholic House Build.
http://stfrancisa2.com/habitat