See Photos taken on July 13, 2002; June 29; On June 15; On June 8; On June 3; On May 18; On March 30, 2002.
| News: ON
July
22, 2002 Steve Polgar, wrote:
On Friday, July 19, Greg Mikol from B-Safe Electric and some Ford employees returned to finish their rough electrical install. Saturday, the installation of the shingles and ridge vent was finished, the front and back porch was continued, interior framing was completed, and the remaining hurricane clips installed. An attempt was made to cut the basement wall to expose more of the window wood framing; more masonry saw blades are needed. A large lunch was brought by Kathy Burns and Laura Stimpson. It's hard going back to work after eating so well, thank you. The lot was cleared of all debris, and all building materials were moved to the rear of the property so the front and sides can be properly graded. Next Saturday, if we pass our rough framing inspection we will install insulation, finish the porches and install the remaining vinyl siding. Thanks to all for your continued help, especially all the returnees. Thanks,
|
The photos on this page were taken
on July 20, 2002.
![]() |
Habitat for Humanity, Catholic House Build.
http://stfrancisa2.com/habitat